- Type
- Boiler flue
- Location
- London, London
- Status
- Complete
- System
- Stainless flue header
The job
A new header and branch legs in a basement plant room.
A boiler flue header replacement in the basement plant room at The Observatory in London.
We stripped out the old flue, installed a new header and replaced every boiler branch leg.
We also piped the condensate from the flue to the drains, with brackets where needed. The work was done in a morning on 22 June 2026.
100%
complete, 22 June 2026
Half
a day on site
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Old flue stripped out
- New flue header
- All boiler branch legs replaced
- Condensate piped to drains with brackets
Project details
- Boiler flue
- London
- Supply and install