- Type
- Process exhaust
- Location
- Derby, East Midlands
- Status
- Won
- System
- Twin wall insulated flue
The job
Flues and hoods for three ovens.
An upgrade for three ovens in the EOS Building at a factory site in Derby.
Three twin wall insulated horizontal flues and three 600 mm square steel hoods, with any removal needed.
3
ovens
600 mm
square steel hoods
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Three twin wall insulated flues
- Three 600 mm square steel hoods
- Removal where needed
- Smoke test and report
- Certificate of conformity
Project details
- Process exhaust
- East Midlands
- Supply and install