Two polished stainless twin wall oven flues rising through the roof steel of a production hall
All projects
Oven flues and hoods GE4180

Rolls-Royce EOS Building

Derby, oven flues and hoods

Type
Process exhaust
Location
Derby, East Midlands
Status
Won
System
Twin wall insulated flue

The job

Flues and hoods for three ovens.

An upgrade for three ovens in the EOS Building at a factory site in Derby.

Three twin wall insulated horizontal flues and three 600 mm square steel hoods, with any removal needed.

3

ovens

600 mm

square steel hoods

On site.

Site photographs. Tap a photo to see it larger.

Rolls-Royce EOS Building, Derby, oven flues and hoods. Twin wall oven flues rising through the roof steel.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Three twin wall insulated flues
  • Three 600 mm square steel hoods
  • Removal where needed
  • Smoke test and report
  • Certificate of conformity

Project details

  • Process exhaust
  • East Midlands
  • Supply and install
Similar workProcess exhaust

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price