Key facts
- phases, 2020 and 2021
- 2
- header off two Ø200 primaries, phase 1
- Ø400
- stack and 5 m horizontal, phase 1
- 12 m
- generator, phase 2
- 900 kW
- gas temperature rating, phase 2 system
- 1,000°C
The challenge
The building needed new exhausts for its standby generators, run from the plantroom up to roof level.
Phase 1 took two generator outlets into one stack. Phase 2 added a 900 kW set, with exhaust gas up to 1,000°C.
At the top the stack had to be held in place on a finished roof, among the louvred plant screens.
What we did
Phase 1: two Ø200 primaries off the generator outlets into a Ø400 header, then a 12 m stack, all twin wall insulated.
Phase 2: a Ø300 and Ø375 twin wall insulated system from a Ø250 outlet, rated for 1,000°C at 5,000 Pa, with offsets to suit the route.
At roof level the offset is held in a galvanised channel frame standing on rubber feet in the gravel.
Supports at high level clamp each stack to the plant steel.
The result
Site photos date phase 1 to June 2020 and phase 2 to March 2021.
The roof frame sits on the gravel without cutting the roof finish.
On site.
4 photographs. Tap a photo to see it larger.
Finishing details
The details we leave behind.
Handover
What the client got.
The documents on record for this job. Handover documents normally go into the customer's project folder before the engineers get home.
- Flue sizing calculationsFrom the generator information
- Working CAD drawingEach phase
- Job-specific RAMSEach phase
- Site photosJune 2020 and March 2021
Got a job like this?