Triad Building

An 18 metre generator exhaust run along the underside of a city office block, then up 7 metres to the roof.

Site
Triad Building
Town
Liverpool, North West
Sector
Commercial offices
Status
Complete

Key facts

twin wall insulated, 50 mm insulation
Ø200
of horizontal run
18 m
stack to the roof
7 m
pressure rating of the system
5,000 Pa

The challenge

A standby generator inside the office block needed an exhaust taken out of the building.

The only route was a long one: along the underside of the building and up to the roof.

Most of the run is outside, so every bracket had to go into the brickwork at height.

What we did

We designed a Ø200 twin wall insulated exhaust with 50 mm insulation, rated to 5,000 Pa.

Inside, the run leaves the generator and crosses the room on drop rods to the wall.

Outside, 18 m of horizontal run is carried on wall brackets along the brickwork, then rises 7 m to the roof.

Work at height was done from a scissor lift.

The result

The exhaust was installed in a single phase in early 2019.

A new weatherproof roof plate and storm collar finish the stack at roof level.

On site.

3 photographs. Tap a photo to see it larger.

Triad Building, Liverpool. The run on wall brackets along the underside of the building.
Triad Building, Liverpool. Leaving the generator and crossing the room on drop rods.
Triad Building, Liverpool. Through the wall and up into the riser.

Finishing details

The details we leave behind.

  • Exhaust on wall brackets

    Wall brackets every few metres

    The long external run is carried on brackets fixed to the brickwork.

  • Roof plate and storm collar

    A new weatherproof roof plate and storm collar where the stack leaves the roof.

Handover

What the client got.

The documents on record for this job. Handover documents normally go into the customer's project folder before the engineers get home.

  • Diameter calculations
  • Working CAD drawingApproved before install
  • Job-specific RAMSAnd working at height rescue plan
  • Site photosJanuary and February 2019