- Price back from drawings or survey
- 10hrs
- Survey within a week of order
- 3days
- Calcs and CAD drawings after survey
- 25min
- Job-specific RAMS
- Sameday
- Order to install, faster when urgent
- 2 to 2weeks
Normal turnarounds. Every job has a Grün project manager on site. Daily photo progress reports during the install. Handover documents normally in your project folder before the engineers get home.
To price it
What we need from you to price it.
Drawings, photos or an outline is enough to start. We price from that or arrange a survey.
- Appliance type and number
- Output in kW or kVA
- Spigot or outlet size
- Approximate vertical and horizontal lengths
- New flue or existing chimney
- Termination
- Site location
What's in the package
Chimney, structure, lift and handover.
The exhaust duty, the chimney structure, the supports, the access and the installation sequence, priced and drawn as one package.
Supply only, install only, or supply and install. Commercial and industrial only, no minimum job size.
- Freestanding chimneys and stacks
- Guyed stacks and masts
- Replacement of existing chimneys
- Fabricated steel chimney sections
- Insulation and cladding
- Base, inspection and drain details
- Cranage and lifting plans
- Calculations, drawings and submittals
The engineering
A 30 metre replacement chimney, drawn before it is built.
Nortex Mill, Bolton. The existing guyed chimney comes down to ground level and a new fabricated steel chimney goes up in three sections. Contract awarded, dates being coordinated.
On site
Lifts, roofs and plantrooms.
Scroll sideways for more
Case studies
Three jobs worth a look.
Send the chimney height, the plant details and a photo.
Price normally within 24 hours of drawings or survey information. Enquiry registered the same day with a job reference.