Polished twin wall oven flues running at high level across a factory hall to a riser
All projects
Flagship project Oven flues GE3135

Factory production hall

Three new oven flues in a factory hall, run at high level on the building steel and taken up through the roof.

Site
Factory production hall
Town
Derby, East Midlands
Sector
Manufacturing
Status
Complete

Key facts

ovens, one flue each
3
twin wall insulated, 200 OD
Ø150
vertical and 5.5 m horizontal
About 12 m
site days, 26 November to 9 December 2024
6

The challenge

Three ovens in a working factory hall needed new flues, and the old flue had to come out first.

The install was planned in three phases, with a weekend day allowed for.

Each oven outlet needed its own bespoke adaptor.

What we did

We surveyed the hall and drew the routes in CAD.

We stripped out the existing flue and fitted three new Ø150 twin wall insulated flues.

Three bespoke adaptors connect the flues to the ovens.

The runs cross the hall at high level on the building steel, then rise through the roof to mesh terminals.

The result

The last oven was connected on 9 December 2024, after we moved a section of ductwork to make room for its horizontal.

Brackets tight and capped, and the site swept and left tidy.

Certificate of conformity issued on 10 December 2024.

On site.

4 photographs. Tap a photo to see it larger.

Factory production hall, Derby. The runs crossing the hall at high level.
Factory production hall, Derby. A flue off its oven, up the column to the roof.
Factory production hall, Derby. Flue rising from the oven to high level.
Factory production hall, Derby. Terminals with mesh guards on the roof.

Finishing details

The details we leave behind.

  • Flue terminal with mesh guard

    Mesh terminals

    Each flue finishes in a terminal with a mesh guard.

  • Flue base sealed on a roof

    Weathered at the roof

    Each flue sealed where it passes through the profiled roof.

  • Flue on brackets up a column

    Capped brackets

    All brackets tight and capped off.

Handover

What the client got.

The documents on record for this job. Handover documents normally go into the customer's project folder before the engineers get home.

  • Survey and CAD drawing
  • Job-specific RAMS
  • Daily engineers' reports26 November to 2 December 2024
  • Completion report9 December 2024
  • Certificate of conformity10 December 2024
  • Technical submittal and O&M manualIn the scope of the estimate